Yes, and it is our most common Beaverton project. If the deck structure is sound, we set new posts to it, build the top rail, and run the cable. The deck stays where it is and the maintenance problem goes away with the old railing.
Yes, and it is our most common Beaverton project. If the deck structure is sound, we set new posts to it, build the top rail, and run the cable. The deck stays where it is and the maintenance problem goes away with the old railing.